Appendix 203. SPECIAL REQUIREMENTS  


Latest version.
  • 203.1

    Streets Graded and Staked

    If the method of sewage disposal is septic tanks the streets in the subdivision shall be at least rough graded before the final plat is submitted. If the method of sewage disposal is sewers the Governmental Engineer, City Manager or Planning Commission may require that the new streets in the subdivision be rough graded.

    The Governmental Engineer, City Manager or Planning Commission may require any new street to have off-set stakes with station numbers, or corner stakes with lot numbers on every-other lot corner on one side of the street.

    See Section 403 for Street and Sewer Profile requirements.

    203.2

    Deed Restrictions, Protective Covenants and Home Owners Association

    If applicable, the Planning Commission may require that one copy of deed restrictions, protective covenants, and/or the document setting up a home-owners association that the developer proposes to impose on the subdivision be filed with the final plat.

    203.3

    Geologic Survey

    If applicable, the Planning Commission may require that a geologic survey be made of the subdivision and that the geologic survey be submitted to the Planning Commission staff before the Planning Commission proceeds with the review process.